 |
The initial steps in the building process are choosing the building
site and deciding on the house plans. |
 |
Next, the builder obtains all necessary permitting then breaks ground and sets the foundation. |
 |
Once the foundation is completed, the
walls and roof system are framed. |
 |
Then comes the installation of the roof shingles, windows and exterior (brick or siding). |
 |
Now that everything is under roof and
"dryed in" in builder speak, all electrical, HVAC
and plumbing are completed. |
 |
Next comes the installation of the drywall. |
 |
Now, doors, moldings and cabinetry are installed and the house is
painted during this time. |
 |
All faucet and electrical fixtures including outlets and lighting and floor coverings are installed.
Also, the yard and landscaping is usually begun at this time. |
 |
Upon final inspection, the home is ready to move-in. |